基于威布尔模型的舰炮武器预防性维修系统构建与优化
余勃彪,侯健
(海军工程大学 兵器工程系,湖北 武汉 430033)
摘要:针对复杂的舰炮武器构建一种新的预防性维修系统,按照维修计划、硬件失效、子系统FMECA、重要功能决断、维修任务评估和确定维修间隔期六个步骤详细分析了系统工作过程;给出了预防性维修能实际应用的条件,并通过基于威布尔分布的失效数据分析来确定系统的预防性维修间隔期。最后给出的算例中,对于收集的失效数据,在确定的恢复性维修费用与预防性维修费用比例下,利用威布尔模型优化预防性维修间隔期,结果表明预防性维修相对于恢复性维修具有良好的经济效果。
关键词:预防性维修;舰炮;费用;RCM
中图分类号:TH17             文献标识码:A         文章编号:1006-0316 (2012) 05-0029-04
Study on the construction for the preventive maintenance system of naval gun weapon system
YU Bo-biao,HOU Jian
(Department of Weaponry Engineering,Naval University of Engineering,Wuhan 430033,China)
Abstract:A new preventive maintenance system was constructed in suit with complicated naval gun weapon, and its working process was analysed detailedly according to six steps as maintenance plan, hardware failure, subsystem FMECA, key function resolution, maintenance mission evaluation and maintenance interval confirmation. The conditions for practical application of preventive maintenance was presented and the preventive maintenance intervals were decided by analysing failuring data based on Weibull distribution. The preventive maintenance interval was optimized with the use of Weibull model under certain proportion between the costs of corrective maintenance and preventive maintenance in the numerical example given at last and it shown the economic validity of preventive maintenance.
Key words:preventive maintenance;naval gun;cost;RCM

———————————————
收稿日期:2011-10-29
作者简介:余勃彪(1979-),湖南平江人,硕士,讲师,主要研究方向为装备综合保障。

 

设为首页  |  加入收藏    |   免责条款
《机械》杂志版权所有     Copyright©2008-2012 Jixiezazhi.com All Rights Reserved 

  电话:028-85925070    传真:028-85925073    E-mail:jixie@vip.163.com

地址:四川省成都锦江工业开发区墨香路48号   邮编:610063

蜀ICP备08103512号

Powered by PageAdmin CMS